Low ~6 ft classroom wall height and corroded roofing sheets at Tisgaon Vidyalay requiring Classroom Renovation Tisgaon Vidyalay (Est. 1993) • Khultabad, Chh. Sambhajinagar
CSR Schedule VII (ii) • Rural School Infrastructure

Classroom Renovation

Targeted civil rehabilitation at Tisgaon Vidyalay (500-student capacity)—raising low ~6 ft classroom walls to 8 ft for natural illumination and airflow, replacing leaking corrugated roof sheets, re-plastering walls, and laying bench-compatible Kota / Shahabad stone flooring.

Tentative Quote / Classroom ₹1,45,500 (400 sq. ft. Unit)
Wall Height Upgrade ~6 ft → 8 ft Maximum
Flooring Specification Kota / Shahabad Stone Slabs
Market Rate Benchmark Chh. Sambhajinagar (2026)
See Per-Classroom Quote
Primary Field Documentation • Video Inspection

On-Site Structural & Monsoon Leakage Audit

Unedited site walkthrough at Tisgaon Vidyalay documenting corroded roof sheets, rainwater ingress points, and low ~6 ft classroom wall height prior to renovation.

Site Audit Recording: Tisgaon Vidyalay, Khultabad Tehsil, Chhatrapati Sambhajinagar User-Controlled Playback
Corroded corrugated roof sheets at Tisgaon Vidyalay
Plate 01 • Roof Corrosion Rusted fasteners and punctured steel sheets causing monsoon leakage.
Cracked cement floor at Tisgaon Vidyalay
Plate 02 • Eroded Floor Pitted cement screed requiring bench-compatible natural stone slabs.
Low ceiling classroom conditions at Tisgaon Vidyalay
Plate 03 • ~6 ft Low Walls Restricted daylight and airflow requiring wall elevation to 8 ft.
Baseline Structural & Civil Audit

9-Point Classroom Renovation Scope

Every classroom undergoes 9 standardized civil upgrades designed for rural durability, natural cross-ventilation, and heavy school bench usage.

01
Priority 01 • Height & Airflow

Wall Height Elevation (~6 ft to 8 ft Max)

Existing ~6 ft low walls block daylight and trap heat. Raising load-bearing masonry by +2 ft to an 8 ft eaves height (plus roof pitch clearance) restores natural illumination and cross-ventilation.

02
Priority 02 • Weatherproofing

Corrugated Sheet Roof Replacement

Worn-out, rusted corrugated steel sheets causing severe monsoon leakage are replaced with 0.50 mm pre-painted galvalume sheets mounted on reinforced MS purlins.

03
Work 03 • Wall Integrity

Deteriorated Wall Plaster Repair

Hacking loose, flaking mortar and applying fresh 12–15 mm cement-sand plaster across newly raised masonry courses and eroded lower wall sections.

04
Priority 04 • Bench-Grade Base

Economy Natural Stone Flooring

Replacing cracked, dusty cement floors with heavy-duty Kota / Shahabad stone slabs—preferred by rural schools for resisting impact and supporting heavy benches without cracking.

05
Work 05 • Teaching Surface

Blackboard Renovation (8 ft × 4 ft)

Replacing pitted, high-glare boards with a smooth, non-glare matte green chalkboard in an anodized aluminum frame for sharp visibility from back benches.

06
Work 06 • Daylight & Ventilation

Window Hinges & Panels Refurbishment

Replacing rusted hinges, stay rods, locking bolts, and damaged window panels so shutters open smoothly for cross-breeze and natural daylight.

07
Work 07 • Classroom Entry

Door Panels Refitting & Refurbishing

Planing and re-aligning warped door shutters, upgrading heavy-duty butt hinges and aldrops, and applying protective primer and enamel coats.

08
Work 08 • Surface Brightness

Interior & Exterior Classroom Coloring

Full primer coat, putty touch-up, and two coats of washable light-reflecting paint to brighten classroom interiors and weather-shield exterior walls.

09
Work 09 • Seepage Protection

Masonry Coping, Ridge Sealing & Stone Skirting

Sealing top wall-to-roof joints with ridge flashing and cement coping, paired with 6-inch stone wall skirting to prevent dampness during wet mopping.

Chhatrapati Sambhajinagar Market Rates (Material + Labour)

Tentative Quote Per Classroom (400 sq. ft. Unit)

Calculated for one standard 20 ft × 20 ft classroom (400 sq. ft.) using prevailing Chhatrapati Sambhajinagar civil contracting rates. CSR partners can adopt 1 classroom or scale across multiple rooms.

#Renovation Item & Rural School SpecificationEst. QuantitySambhajinagar RateTentative Cost
01Wall Height Raising (~6 ft to 8 ft max)
+2 ft 9" brick/fly-ash masonry (1:6 mortar) & top coping band
140 sq. ft. (net wall)₹110 / sq. ft.₹15,400
02Corrugated Sheet Roof Replacement
0.50 mm pre-painted galvalume sheets, MS purlin repair & J-bolt/ridge fixing
460 sq. ft. (incl. eaves)₹110 / sq. ft.₹50,600
03Deteriorated Wall Plaster Repair
Hacking loose plaster + 12–15 mm cement-sand plaster on raised & damaged walls
500 sq. ft.₹36 / sq. ft.₹18,000
04Economy Natural Stone Flooring (Bench-Compatible)
Heavy-duty Kota / Shahabad stone slabs (25–30 mm) on mortar bed + 6" skirting
400 sq. ft.₹85 / sq. ft.₹34,000
05Blackboard Renovation (8 ft × 4 ft)
Non-glare matte green chalkboard with anodized aluminum frame & wall mounting
1 Unit (32 sq. ft.)₹6,500 / unit₹6,500
06Window Hinges, Panels & Door Refitting
Replacement of worn hinges, tower bolts, aldrops, stay rods & minor shutter refitting
1 Classroom (L.S.)₹4,500 / room₹4,500
07Interior & Exterior Classroom Coloring
Primer coat, putty touch-up & 2 coats washable distemper / exterior emulsion
1,100 sq. ft.₹15 / sq. ft.₹16,500
TENTATIVE TOTAL PER CLASSROOM (400 sq. ft. • Material + Labour)₹1,45,500
Single Classroom Adoption ₹1,45,500

Complete 7-point renovation of 1 Classroom (400 sq. ft.) with donor recognition plaque.

3-Classroom Cluster ₹4,36,500

Complete renovation of 3 Classrooms (1,200 sq. ft.) serving ~150 students per shift.

5-Classroom Wing (2,000 sq. ft.) ₹7,27,500

Full wing rehabilitation of 5 Classrooms with milestone-linked Utilization Certificate.

Global ESG & Field Governance

UN SDG Alignment & Execution Team

UN SDG Goal 4 Quality Education SDG 4 • Target 4.a Safe Learning Facilities
UN SDG Goal 9 Resilient Infrastructure SDG 9 • Target 9.1 Durable School Infrastructure
UN SDG Goal 11 Sustainable Communities SDG 11 • Target 11.c Local Materials & Labour
Mr. Navnath Adhane - Project Head
Mr. Navnath AdhaneProject Head
Mr. Suresh HiwardeCivil Execution Lead
Mr. Suresh GaikeSchool Liaison
Mr. Sunil TidkeProject MIS & Audit
Companies Act, 2013 • Section 135

CSR Schedule VII, Item (ii) Eligibility

Qualifies under Schedule VII, Item (ii) (promoting education through resilient school infrastructure). Implemented by Satyashodhak Mahila Vikas Mandal (Head Office: Chhatrapati Sambhajinagar; School: Tisgaon Vidyalay, Khultabad Tehsil).

MCA CSR-1 Number CSR00030098
NITI Aayog Darpan ID MH/2022/0315475
Income Tax Approval Form 332 (Rule 7A)
Tax Exemption Filing Form 354 (Rule 3A)
CSR Due Diligence

Frequently Asked Questions

1. Why is wall height raised from ~6 ft to 8 ft instead of higher?
Existing walls are ~6 ft high, blocking natural light and cross-ventilation. Raising load-bearing walls by +2 ft to an 8 ft eaves height (plus roof pitch clearance) is structurally safe for the existing foundation while markedly improving classroom brightness and airflow.
2. Why is Kota / Shahabad stone flooring chosen over vitrified tiles?
Vitrified tiles are brittle and crack easily under heavy steel and wooden school benches. Natural Kota or Shahabad stone slabs (25–30 mm thick) provide a level, virtually indestructible, low-maintenance floor built for decades of rural classroom use.
3. How much does it cost to sponsor one classroom?
Based on Chhatrapati Sambhajinagar market rates (materials + labour), complete 7-point civil Classroom Renovation for a standard 400 sq. ft. classroom is tentatively estimated at ₹1,45,500. CSR partners can sponsor 1 classroom (₹1,45,500), 3 classrooms (₹4,36,500), or a 5-classroom wing (₹7,27,500).
4. How is academic disruption avoided during construction?
Masonry height extension, roof sheet replacement, and stone slab laying are executed during school vacation windows and rotational classroom shifts so teaching continues uninterrupted.
5. What statutory registrations and audit documents are provided?
Satyashodhak Mahila Vikas Mandal holds MCA CSR-1 (CSR00030098), NITI Aayog Darpan ID (MH/2022/0315475), and Income Tax approvals under Form 332 (Rule 7A) and Form 354 (Rule 3A). Partners receive GST vendor invoices, Measurement Book records, geo-tagged completion photos, and a signed Utilization Certificate (UC).
Corporate Social Responsibility

Adopt One or More Classrooms at Tisgaon Vidyalay

Sponsor complete Classroom Renovation at ₹1,45,500 per classroom with full statutory compliance and milestone-linked Utilization Certificates.

Collaborate Now
Primary Field Documentation

Technical Site Evidence & Monsoon Audit

Field Video Audit On-site inspection of corroded classroom roofing and monsoon water seepage at Tisgaon Vidyalay.
Click Play to Inspect
Roof leakage audit showing corroded metal sheets at Tisgaon Vidyalay
Plate 01 • Overhead Envelope

Roofing Sheet Corrosion & Seepage Points

Visual verification of rusted fasteners and perforated roof panels permitting rainwater entry directly above student seating rows.

Students studying on worn cement flooring at Tisgaon Vidyalay
Plate 02 • Floor Surface

Deteriorated Cement Screed Baseline

Abraded cement floor surfaces generating fine dust particles and requiring complete vitrified tile overlay and wall dado protection.

Financial Transparency & Project Controls

Phase I Budget Outlay & Field Governance

Work Package A • Roofing ₹6,80,000

MS structural trusses, purlins, 0.50 mm pre-painted galvalume sheets, insulation & guttering.

Work Package B • Flooring ₹4,20,000

Sub-base leveling, anti-skid vitrified floor tiling (2,000 sq. ft.), and 4-ft wall dado skirting.

Total Phase I CSR Requirement ₹11,00,000

Funding Status: 0% Committed • 100% Open for CSR Grant

On-Ground Execution & Oversight Team
Mr. Navnath Adhane - Project Head Mr. Navnath Adhane Project Head
Mr. Suresh Hiwarde Civil Execution Lead
Mr. Suresh Gaike Community & School Liaison
Mr. Sunil Tidke Project MIS & Documentation

All project receipts, vendor invoices, and tranche disbursements are recorded in Satyashodhak Mahila Vikas Mandal's ERP ledger for donor audit review.

4-Stage M&E Quality Protocol
  • Stage 1:Pre-work Measurement Book (MB) sign-off and material batch verification.
  • Stage 2:Structural truss fabrication, anti-rust primer, and sheet fastening inspection.
  • Stage 3:Floor screed leveling, vitrified tile slope check, and joint grouting audit.
  • Stage 4:Geo-tagged completion report, Utilization Certificate (UC), and handover to Tisgaon Vidyalay SMC.
CSR Grant & Co-Funding Partnership

Partner to Restore Safe Classrooms for 500 Rural Students

Sponsor the complete Phase I restoration (₹11,00,000) or co-fund either the Roofing Package (₹6,80,000) or Flooring Package (₹4,20,000) with milestone-linked Utilization Certificates.

Corporate Grant Compliance

CSR Due Diligence: Frequently Asked Questions

1. How does Classroom Restoration align with CSR Schedule VII?
It directly qualifies under Companies Act, 2013, Section 135, Schedule VII, Item (ii): Promoting education, including special education and employment-enhancing vocation skills, through safe school infrastructure.
2. What is the exact civil scope of Phase I?
Phase I covers 2,000 sq. ft. of instructional floor area at Tisgaon Vidyalay, comprising corroded roof dismantling and replacement with insulated galvalume sheets (₹6,80,000) and vitrified floor and wall dado tiling (₹4,20,000).
3. Why is vitrified flooring prioritized over cement repair?
Cement screed rapidly abrades under daily student footfall, generating fine dust that affects respiratory and skin health. Heavy-duty anti-skid vitrified tiles provide a non-porous, washable surface suited for rural classrooms.
4. What roofing specifications are used for monsoon and heat resilience?
We specify 0.50 mm TCT pre-painted galvalume sheets with anti-corrosion aluminum-zinc alloy coating, mounted on reinforced MS trusses with under-deck thermal insulation and rainwater guttering.
5. How is academic disruption avoided during civil work?
Dismantling, welding, and tile installation are scheduled during school vacation periods and rotational classroom shifts with safety barricading so instructional hours remain uninterrupted.
6. How are fund utilization and construction quality verified?
Work is executed against a pre-approved BoQ with stage-gate Measurement Book (MB) checks, geo-tagged progress photos, vendor GST invoices logged in our ERP system, and a formal Utilization Certificate (UC).
7. Can a CSR partner fund a single work package instead of the full outlay?
Yes. Corporate partners may underwrite the entire Phase I grant (₹11,00,000) or adopt either the Roofing Package (₹6,80,000) or the Flooring Package (₹4,20,000) under a dedicated MoU.
8. What statutory tax and CSR credentials does the NGO hold?
Satyashodhak Mahila Vikas Mandal is registered on the MCA portal under CSR-1 (CSR00030098), listed on NITI Aayog NGO Darpan (MH/2022/0315475), and approved under Income Tax Form 332 (Rule 7A) and Form 354 (Rule 3A).